Product parameters:
1. BZC400ZY water well drilling rig equipment is convenient and flexible for moving. All devices are installed on the chassis, which is convenient for integration and movement. It adopts cross-country vehicle chassis to adapt to bad road condition.
2. Comprehensive design makes the machine work steady in extremely harsh climate.
3. For the high integration degree, preparation work before operation is quick and convenient.
4. It is applicable to the field of metallurgy, geology, petroleum, coal, water conservancy, forestry, troops, building materials and so on.
5. It is suitable for operating in clay layer, sand layer, gravel layer, gravel layer, bed rock, etc.
6. Water well drilling rig adopts all hydraulic top head drill, which greatly improve the drilling efficiency.
7. All rigs all adopt full hydraulic control, which is simple and convenient.
8. It is featured with low maintenance cost.
9. Our drilling equipments are accredited by the ISO9001:2008 certification, military enterprises certification and the implementation of national and military standards.
Technical parameter |
|||
Drilling depth(M) |
400 |
||
Drilling diameter(mm) |
500 |
||
Speed of turntable(r/min) |
21.2;36;63.2;100.6;155;20.2(reverse) |
||
Torque of turntable(KN.m) |
18;10.6;6;3.8;2.5;18.9(reverse) |
||
Single rope lifting capacity of main windlass(KN) |
45 |
||
The capacity of main windlass(KN) |
270 |
||
Single rope lifting capacity of hydraulic windlass(KN) |
40 |
||
The capacity of hydraulic windlass(KN) |
160 |
||
The lifting capacity of hook(KN) |
270 |
||
Bearing capacity of mast (KN) |
270 |
||
The height of mast (mm) |
11500 |
||
Bearing capacity (t) |
30 |
||
Pipe |
Kelly (mm) |
108×108×7500 |
|
Assistant pipe (mm) |
Ф89×10×5500 |
||
Hydraulic pump |
Model |
CB-HP80/40 |
|
Pump delivery (ml/r) |
80/40 |
||
Rated speed (r/min) |
2000 |
||
Rated pressure(MPa) |
20 |
||
BW850/20 |
Diameter of cylinder (mm) |
150 |
|
Stroke of piston (mm) |
180 |
||
Theory of flow (L / min) |
600 850 |
||
Rated pressure (Mpa) |
3 2 |
||
Pounding times (min-1) |
58 82 |
||
Diameter of suction tube (mm) |
127 |
||
Diameter of drain pipe (mm) |
64 |
||
Input speed (r / min) |
470 |
||
Input power (kw) |
40 |
||
Overall dimensions (mm) |
2000*1030*1400 |
||
Weight (t) |
1.5 |
||
Truck chassis |
Model |
TAZ5183TZJ |
|
Drive form |
6×4 |
||
Engine |
Model |
CA6DE3-20E3(Europe Ⅲemission standard) |
|
Rated power(KW) |
147 |
||
Speed (r/min) |
2300 |
||
Size (L*W*H)(mm) |
11110×2490×2500 |
||
Electric generator |
Model |
MF |
|
Rated power (kw) |
15 |
||
Rated voltage(v) |
400 |
||
Rated current(A) |
27 |
||
Speed (r/min) |
1500 |
||
Frequency(Hz) |
50 |
||
Protection level |
IP21 |
||
Insulation Class |
H |
||
The best working gear (or speed) |
5th gear(1000-1400r/min) |
||
The highest speed(Km/h) |
75 |
||
Weight (kg) |
19340 |
||
Transport size(L*W*H)(mm) |
12160*2490*3440 |
||
Working size(L*W*H)(mm) |
11110*2490*13110 |
Main functions of drilling:
1. Obtain underground physical data and obtain core, cuttings, oil, water, natural gas, etc. from the bottom of the well.
2. As a geophysical logging channel, obtain data on various geophysical fields of the rock formation, such as underground military fire tests.
3. As an artificial channel, observe the mineral, hydrological and geological structures in the stratum.
4. Comprehensive application, comprehensive exploration and acquisition, and the use of underground resources.
The rig should be checked at any time
1. Check the consolidation of the wire rope end;
The contents of the wire rope inspection are: the number of safety rings of the wire rope, the selection, installation and lubrication of the wire rope, the defect inspection of the wire rope, such as the diameter and wear of the wire rope, the number of broken wires of the wire rope, etc.;
2. Check the pulley system of the drilling machine at any time. The main inspection items are: the condition of the pulley body and the anti-jumping device of the transition pulley;
3. Check the walking system of the drilling rig at any time. The main inspection items are: the condition of the pile machine, the card board and the hook pipe system, and the laying of the sleeper;
Third, do a good job of rig maintenance and repair records, the replacement parts should have a detailed record to ensure that the spare parts are used within the validity period, or keep abreast of the time of the next replacement;
4. If the rig is faulty, stop the operation immediately and do not use it until the fault is not eliminated.