Shandong Binzhou Forging and Pressing Machinery Factory
Shandong Binzhou Forging and Pressing Machinery Factory
0543332589
0543332589
bbj@bzdyjx.com
bbj@bzdyjx.com
Produst Categories
  • 暂无分类
Contact Supplier
Shandong Binzhou Forging and Pressing Machinery Factory
Add:No. 534, Huanghe Fourth Road, Binzhou City, Shandong
Tel:0543332589
Phone:0543332589
Email:bbj@bzdyjx.com
  CURRENT POSITION: HOME  >PRODUCTS CENTER > product detailed information
Borehole Well Drilling Machine
Number of visits: 151
Unit Price: Face to face
Minimum Ordering:
Total supply:
period for dispatch: Delivery within 3 days from the date of buyer's payment
Valid until: Long-term effectiveness
Last update: 2020-04-23 09:27
Product Details
 

Product introduction:

CYTL300 borehole well drilling machine is designed with gantry trailer type, mast rising up by itself, suitable for buildings, bridges, geological mines, harbors, dam foundations, well construction, ground source heat pump drilling construction.

 

1(001) 2(001)

3(001) 4(001)

5(001)

Product parameters:

Drill depth(m)

300

Drill diameter(mm)

500

Inner diameter of turntable(mm)

340

Ntable rotation speed(forward and reverse)(r/min)

36;52

Rated output torque of turntable(KN.m)

10

Main hoist lifting capacity(single rope)(KN)

30

Bearing capacity of hydrant(KN)

150

Matching power of main machine(KW)

22

The weight of whole machine(kg)

3210

 

Rig operation

1、 preparation

⑴Check all the parts, Reinforcement if necessary

⑵Check Gearbox oil and lubricating grease for each rotation part

The gearbox is refueling to limited oil levelWhen there is no oil screw plug, take the shaft

The lowest position of the bearing hole is the height of the oil surface

⑶Check all the hand shank and in neutral position

⑷Flexible rotation of operating parts

⑸Check that the power line or diesel engine is ready before starting, and that the direction of rotation is correct.

 

In case of personal accident and prolonging service life, the customer must do the following:

1、Regular inspection, maintenance

2、After the rig is used for a period of time, usually one to two months or 300 to 500m,Cleaning machine, clearance adjustment

3、Oil should be injected to lubricate all rotation parts during well drilling

4、Abnormal noise during rig operation, high temperature or apparent displacement of parts, all required to Stop check the cause, troubleshooting after the start.

5、When moving, the tower should be lowered slowly and not fall down

6、When drilling is needed, the drilling tools should be sent slowly.

7、Use drill bits of different shapes for different formations

8、The drill pipe must be bent and the thread should be protected when unloading the drill pipe or handling.

9、The clutch adjustment is shown in the attached drawings

 

Measures for the use of the water well rig during the running-in period

1. The operator should receive training and guidance from the manufacturer, have a thorough understanding of the structure and performance of the rig, and obtain certain operation and maintenance experience before operating the machine. The product maintenance and repair instructions provided by the manufacturer are the necessary information for the operator to operate the equipment. Before operating the machine, be sure to read the maintenance instructions and operate and maintain according to the requirements of the manual.

2. Pay attention to the working load during the running-in period. The working load during the running-in period should not exceed 80% of the rated working load, and the appropriate workload should be arranged to prevent the overheating caused by the continuous operation of the machine for a long time.

3. Pay attention to the indications of each instrument frequently. If an abnormality occurs, it should be stopped in time to be excluded. If the cause is not found, the operation should be stopped before the fault is not eliminated.

4. Pay attention to check the position and quality of lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water) frequently, and pay attention to check the sealing performance of the whole machine. During the inspection, it was found that the oil and water were too much, and the reason should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended that the lubrication point be filled with grease for each shift during the running-in period (except for special requirements).

5. Keep the machine clean, adjust and tighten the loose parts in time to prevent the parts from being worn out or the parts being lost due to looseness.

6. At the end of the running-in period, the machine should be forcedly maintained, checked and adjusted, and the oil should be replaced.

Send your message to this supplier
*MAIN MENTION:
*To:     Shandong Binzhou Forging and Pressing Machinery Factory
*Message:

This is not what you are looking for?
Hot Products China Products China Manufacturers/Suppliers Wholesale Products Wholesale Price Continent Channel Product Index
Focus Technology: dasgoo.com m.dasgoo.com 袋鼠货柜
Copyright ©2015 dasgoo.com All rights reserved. | 备案证书号:鲁ICP备15042143号