|
|
High temperature water plugging and profile control agent
Number of visits: |
22 |
Unit Price: |
Face to face |
Minimum Ordering: |
|
Total supply: |
|
period for dispatch: |
Delivery within 3 days from the date of buyer's payment |
Valid until: |
Long-term effectiveness |
Last update: |
2021-03-29 09:18 |
|
|
Profile control and water shutoff means that when the high permeability layer is plugged from a water injection well, the water absorption profile of the water injection interval can be adjusted or when the high permeability layer is plugged from an oil production well, the water production of the oil well can be reduced.
Send your message to this supplier