The installation steps of the air heat pump are briefly mentioned here. The first is the foundation production. This can use cement or channel steel. The foundation must be above the load-bearing beam on the floor. Then the placement position is adjusted. When installing, we must ensure that the placement of the air heat pump is stable. The shock-absorbing rubber pads are used between the unit and the foundation for seismic processing. The connection of the road system is mainly the connection of water pumps, valves, filters, etc. between the host and the water tank. After doing the above steps, you need to do a water pressure test. This is mainly to check the pipeline connection to see if there is any leakage. Fixed anchor bolts must use regular manufacturer's anchor bolts. Poor quality anchor bolts will greatly reduce the service life of the bolts, lightly cause the bolt threads to loosen and cause equipment damage, and seriously cause the screw parts of the anchor bolts to deform. , Even the breakage caused the equipment to fall directly and be damaged. More serious accidents occur.