1. All special equipment purchased, introduced, installed, and technologically modified must comply with the relevant national standards for quality and technical supervision, safety and health regulations, especially for the selection and procurement of dangerous cranes. Approved.
2. When the purchased crane leaves the manufacturing plant, it will be subject to the safety and technical inspection of the local municipal quality and technical supervision department, and issued randomly after obtaining the "Crane Safety and Technical Supervision Verification Certificate.
3. The hoisting machinery installation unit must obtain a qualification certificate, and the installer must have an operating certificate and a job permit to engage in the installation of the hoisting machinery and submit it to the superior safety and equipment department for review and record.
4. Before the crane is delivered for trial operation, the installer must first perform a self-inspection and fill in the self-inspection report. After receiving the pre-acceptance from the receiving unit for pre-acceptance (there should be a complete record), the supervisor in charge of safety, equipment department testing, acceptance inspection and approval shall Can be put into trial operation.
5. The formal acceptance must be performed in accordance with the regulations of the superior competent technical, safety, and equipment departments and the labor protection "three simultaneous" management standards.
6. Strengthen the management of cranes. Carefully implement the crane's various management systems and safety inspection systems, do a good job of regular inspection, maintenance, and maintenance of cranes, and eliminate hidden dangers in a timely manner, so that the crane is always in good working condition.
7. Strengthen the education and training of crane operators, strictly implement safe operating procedures, improve the operational technical capabilities and the ability to handle emergency situations.