BZLD200 underground borehole drilling rig is designed with rubber chassis; hydraulic cylinder tower;four hydraulic jacks. It can be put on the truck directly.It is suitable for well construction.
Product parameters:
Technical reference number |
|
Drill hole depth (m) |
200 |
The hole diameter (mm) |
500 |
Equipped with drill pipe (mm) |
89x10x3500 |
The main winding tension(t) |
2.5 |
Deputy winding speed(m/min) |
60 |
The winding tension(t) |
1.7 |
The main winding speed(m/min) |
60 |
Rotary table size (mm) |
340 |
Rotary speed (r/min) |
36,53,90 |
The length of drill pipe (mm) |
5000 |
Transport size (LXWXH)(mm) |
9200x2350X2700 |
Derrick effective height (mm) |
8600 |
Derrick bearing (t) |
10 |
The weight(t) |
64 |
Deputy rod length |
3500 |
Rubber tracks the length of the chassis |
2400 |
Rubber tracks chassis width |
2000 |
Rubber tracks ride height |
470 |
Walking speed (km/h) |
0-15 |
1. The structure is simple, there is circulation washing system, and It can be on a truck directly when the four legs up and transport .
2. Rotary drilling rig relies on the rotary movement of the drilling tool to break the rock formation
3. Measures for the use of the water well rig during the running-in period:
Reduce load, pay attention to inspection, and strengthen lubrication. As long as the maintenance and maintenance of the construction machinery running-in period are emphasized and implemented as required, it will reduce the occurrence of early failures, prolong the service life, improve the operation efficiency, and bring you more economic benefits.
Engineering case: