Automatic Cutting Machine For Stone Plate Bottom

 
Brand: sambin
Shape size(L×W×H): 6500×2800×2400
Main motor power: 18.5kw
weight: 5000
Price: 9500.00Dollar/Piece
Order: 1
Total amount: 10000
Delivery period: From the date of payment by the buyer 30 shipped within days
Valid until: long term effective
latest update: 2019-02-28 09:31
Browse times: 113
 
 
COMPANY BASIC INFORMATION
Detailed description

Product introduction

The automatic cutting machine for stone plate bottom adopts a combined structure, and the trolley adopts frequency conversion speed regulation. It can be adjusted according to stone material and feed quantity. It has high cutting efficiency and high automation. It is suitable for cutting the bottom surface of waste board. It can make full use of the bottom of waste board, improve the utilization rate of stone resources and bring more economic benefits.

image001

 

Technical parameter of stone plate bottom cutting machine

Item no.

unit

SPC-1300 gantry stone cutting machine

SPC-1300 cantilever stone cutting machine

Maximum saw diameter

mm

Φ400

Φ400

Workbench dimensions(L×W)

mm

3000×1500

3000×1500

Machining height range

mm

50-400

50-500

water consumption

m³/h

3

3

Main motor power

kw

18.5kw+11kw

18.5kw

Total power

kw

33

22

Shape size(L×W×H)

mm

6500×2800×2400

6500×2600×2300

weight

kg

5000

4000

 

Features of stone plate bottom cutting machine

Stone resources are non-renewable. Making the best use of raw materials is the common goal of every stone machinery factory. After one year's research and development, Sambin Stone Machinery has been put into practice and improved, and is now being promoted to the market. This stone plate bottom cutting machine uses cross beam cutter to improve cutting accuracy, break the traditional single-axis size saw blade combination, use double-axis size saw blade combination to improve cutting efficiency, reduce energy consumption, cut plate more precise than traditional cutting, improve efficiency of pipeline operation.

 

FAQ

Q. What is your terms of payment?

A: T/T 30% as deposit, and 70% the balance before delivery.

Q. What is your terms of delivery?

A: EXW, FOB, CFR, CIF..

Q. How about your delivery time?

A: Generally,it will take 15 to 30 working days after received your deposit.Also depends on the items and the quantity of your order.

Q. Do you test all your goods before delivery?

A: Yes, we have 100% test before delivery

Q: How do you make our business long-term and good relationship?

1. With high quality products and competitive price;

2. We respect each customer and sincerely do business, Win-Win Cooperation.

Other products of this company
Hot Products China Products China Manufacturers/Suppliers Wholesale Products Wholesale Price Continent Channel Product Index
Focus Technology: dasgoo.com m.dasgoo.com
Copyright ©2015 dasgoo.com All rights reserved. 鲁ICP备16029387号-15