Bangladesh Well Drilling Rig Craigslist

 
Price: Negotiable
Order: 0
Total amount: 0
Delivery period: From the date of payment by the buyer 3 shipped within days
Valid until: long term effective
latest update: 2020-04-23 09:20
Browse times: 35
 
COMPANY BASIC INFORMATION
Detailed description
 1
 

Product parameters:

1. BZC400ZY water well drilling rig equipment is convenient and flexible for moving. All devices are installed on the chassis, which is convenient for integration and movement. It adopts cross-country vehicle chassis to adapt to bad road condition.

2. Comprehensive design makes the machine work steady in extremely harsh climate.

3. For the high integration degree, preparation work before operation is quick and convenient.

4. It is applicable to the field of metallurgy, geology, petroleum, coal, water conservancy, forestry, troops, building materials and so on.

5. It is suitable for operating in clay layer, sand layer, gravel layer, gravel layer, bed rock, etc.

6. Water well drilling rig adopts all hydraulic top head drill, which greatly improve the drilling efficiency.

7. All rigs all adopt full hydraulic control, which is simple and convenient.

8. It is featured with low maintenance cost.

9. Our drilling equipments are accredited by the ISO9001:2008 certification, military enterprises certification and the implementation of national and military standards.

 

Technical parameter

Drilling depthM

400

Drilling diametermm

500

Speed of turntabler/min

21.23663.2100.615520.2reverse

Torque of turntableKN.m

1810.663.82.518.9reverse

Single rope lifting capacity of main windlassKN

45

The capacity of main windlass(KN)

270

Single rope lifting capacity of hydraulic windlassKN

40

The capacity of hydraulic windlass(KN)

160

The lifting capacity of hookKN

270

Bearing capacity of mast (KN)

270

The height of mast (mm)

11500

Bearing capacity (t)

30

Pipe

Kelly mm

108×108×7500

Assistant pipe (mm)

Ф89×10×5500

Hydraulic pump

Model

CB-HP80/40

Pump delivery (ml/r)

80/40

Rated speed (r/min)

2000

Rated pressure(MPa)

20

BW850/20 
Mud pump

Diameter of cylinder (mm)

150

Stroke of piston (mm)

180

Theory of flow (L / min)

600 850

Rated pressure (Mpa)

3 2

Pounding times (min-1)

58 82

Diameter of suction tube (mm)

127

Diameter of drain pipe (mm)

64

Input speed (r / min)

470

Input power (kw)

40

Overall dimensions (mm)

2000*1030*1400

Weight (t)

1.5

Truck chassis

Model

TAZ5183TZJ

Drive form

6×4

Engine

Model

CA6DE3-20E3(Europe Ⅲemission standard)

Rated powerKW

147

Speed r/min

2300

Size L*W*H(mm)

11110×2490×2500

Electric generator

Model

MF

Rated power (kw)

15

Rated voltage(v)

400

Rated current(A)

27

Speed (r/min)

1500

Frequency(Hz)

50

Protection level

IP21

Insulation Class

H

The best working gear (or speed)

5th gear1000-1400r/min

The highest speedKm/h

75

Weight kg

19340

Transport sizeL*W*H(mm)

12160*2490*3440

Working sizeL*W*H(mm)

11110*2490*13110

 

Main functions of drilling:

1. Obtain underground physical data and obtain core, cuttings, oil, water, natural gas, etc. from the bottom of the well.

2. As a geophysical logging channel, obtain data on various geophysical fields of the rock formation, such as underground military fire tests.

3. As an artificial channel, observe the mineral, hydrological and geological structures in the stratum.

4. Comprehensive application, comprehensive exploration and acquisition, and the use of underground resources.

The rig should be checked at any time

1. Check the consolidation of the wire rope end;

The contents of the wire rope inspection are: the number of safety rings of the wire rope, the selection, installation and lubrication of the wire rope, the defect inspection of the wire rope, such as the diameter and wear of the wire rope, the number of broken wires of the wire rope, etc.;

2. Check the pulley system of the drilling machine at any time. The main inspection items are: the condition of the pulley body and the anti-jumping device of the transition pulley;

3. Check the walking system of the drilling rig at any time. The main inspection items are: the condition of the pile machine, the card board and the hook pipe system, and the laying of the sleeper;

Third, do a good job of rig maintenance and repair records, the replacement parts should have a detailed record to ensure that the spare parts are used within the validity period, or keep abreast of the time of the next replacement;

4. If the rig is faulty, stop the operation immediately and do not use it until the fault is not eliminated.

400zy2

 

 

Hot Tags: bangladesh well drilling rig craigslist, China, manufacturers, suppliers, factory, price, cheap, for sale

Other products of this company
Hot Products China Products China Manufacturers/Suppliers Wholesale Products Wholesale Price Continent Channel Product Index
Focus Technology: dasgoo.com m.dasgoo.com
Copyright ©2015 dasgoo.com All rights reserved. 鲁ICP备16029387号-15