Product introduction:
BZCDF150SDF truck mounted hydraulic drill rigs is our self-dependent innovation product. It is top head drive drilling rig. It adopts DonGFENG TRUCK 4x2 special truck chassis and the generator, hydraulic system, electronic control system, 6BS gravel pump, drill tower are on the chassis.
Product parameters:
Technical parameter |
|||
Max-Drill depth(m) |
150 |
||
Drill diameter(mm) |
450 --- 2000 |
||
Top head speed(r/min) |
22 |
||
Top head torque(kN.m) |
7.5 |
||
Single line pull force of minor winch(t) |
3 |
||
Tower height(mm) |
6980 |
||
Bearing (t) |
20 |
||
Drill pipe(mm) |
Ф168×6×2000 |
||
6BS gravel pump |
theoretical flow(L/min) |
200 |
|
Input power(kw) |
30 |
||
vacuum pump |
Max-displacement(L/min) |
4.66 |
|
Input power((kw) |
7.5 |
||
|
|
model |
YC6J160-33 |
Rated power(KW) |
132 |
||
speed(r/min) |
2500 |
||
Drive form of chassis |
4x2 |
||
|
Rated power(kW) |
100 |
|
Rated voltage (V) |
400 |
||
frequency (Hz) |
50 |
||
Walking speed(km/h) |
75 |
||
Transport dimension (L×W×H)(mm) |
9620*2480*3920 |
||
Working dimension (L×W×H)(mm) |
8680*4560*8630 |
Measures for the use of the water well rig during the running-in period
1. The operator should receive training and guidance from the manufacturer, have a thorough understanding of the structure and performance of the rig, and obtain certain operation and maintenance experience before operating the machine. The product maintenance instructions provided by the manufacturer are the necessary information for the operator to operate the equipment. Before operating the machine, be sure to read the maintenance instructions.
2. Pay attention to the working load during the running-in period. The working load during the running-in period should not exceed 80% of the rated working load, and the appropriate workload should be arranged to prevent the overheating caused by the continuous operation of the machine for a long time.
3. Pay attention to the indications of each instrument frequently. If an abnormality occurs, it should be stopped in time to be excluded. If the cause is not found, the operation should be stopped before the fault is not eliminated.
4. Pay attention to check the position and quality of lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water) frequently, and pay attention to check the sealing performance of the whole machine. During the inspection, it was found that the oil and water were too much, and the reason should be analyzed.
5. Keep the machine clean, adjust and tighten the loose parts in time to prevent the parts from being worn out or the parts being lost due to looseness.
6. At the end of the running-in period, the machine should be forcedly maintained, checked and adjusted, and the oil should be replaced.
Maintenance method
1 The new rig running a month, you should replace the FAST gearbox oil and carousel summer with 85W / 90GL-5 gear oil, in winter with 85W / 90GL-4 gear oil.
2 It should be checked before each operation of the rig parts of lubrication, mud pump oil lubrication of the piston rod box to promptly fill lubricating oil in a timely manner to facilitate the box dripping oil on the piston rod, extend the life of the rod. Dongfeng to observe the oil level in the gearbox and wheel.
3 If broken wire rope off shares must be replaced immediately;
4 Swivel adjustment: if the swivel leak water ,adjusting nut to adjust the ring gap or replace a new seal;
5 Adjust swivel: there will be leak if the sealing rings broken. And you can adjust its nut or change the new sealing rings for solving.
6 Truck diesel engine's maintenance(Refer to the chassis engine specification)